Guide Rail Equipment

APPLICATIONS:Pre-installation in below locations and immediate operating will be helpful to
prevent important areas from flooding.
A. Public construction sites, such as tunnel and subway.
B. Basement of buildings, to avoid damages/losses of property.
C. Industries, to avoid damages of valuable equipment’s and working spaces.

FEATURES
1. Discharges of guide rails are sized to 2″, 3″, 4″, 6″, 8″ and suits to most of ranges.
2. Materials of guide rail are FT series/cast iron and KFT/stainless steel.
3. Convenient installation and removal by slide up/down the pump.

INSTALLING STEPS
Step 1. connect a tube with mounting base, and make the base and upper guide rail positioning bracket fixed.
Step 2. lift down the pump by guiding elbow and pulling chains.
Step 3. steadily locate the pump to engage the base.

Accessories

1.Mounting base
2.Pump adapter
3.Upper guide rail positioning bracket
4.Stainless steel chains
Note: Guide rails and pipe are not furnished.


Warning: sizeof(): Parameter must be an array or an object that implements Countable in /home/cp944768/public_html/blue-ocean.co.th/wp-content/themes/wp-yellow-hats/woocommerce/single-product/meta.php on line 17

Reviews

There are no reviews yet.

Be the first to review “Guide Rail Equipment”

Your Rating

Blue Ocean Pump & Blower

Request A Quote